
Freight traffic runs in the Northern Growth Zone even under exceptional circumstances

The One Hour Train will strongly develop the railway line between Turku and Helsinki as part of the EU level Mediterranean Sea–Scandinavia core network corridor. The project requires 95 kilometres of new track on the route Espoo–Lohja–Salo and double tracks between Turku and Salo.
The One Hour Train will strongly develop the railway line between Turku and Helsinki as part of the EU level Mediterranean Sea–Scandinavia core network corridor. The project requires 95 kilometres of new track on the route Espoo–Lohja–Salo and double tracks between Turku and Salo.